Book Design
I love the book design process: from reading an un-finished manuscript, working with the Author to bring their story to life and holding the final product in my hands and smelling the fresh ink.
Book Design
Cover Art
Photo Selection
Hardcover books designed for Patagonia Books printed on 100% post-consumer-waste recycled paper

